blue-check Bases for determination of unit labor costs of construction consultant experts

Official letter No. 3788/BXD-KTXD dated August 25th, 2022 of the Ministry of Construction regarding guidelines on some contents relating to unit labor costs for construction consultant experts and construction investment consultancy expense estimates
Posted: 19/9/2022 8:41:42 AM | Latest updated: 24/9/2022 11:59:58 AM (GMT+7) | LuatVietnam: 5544
VietlawOnline

The Ministry of Construction notes that now unit labor costs for construction consultant experts are uniformly carried out according to the regulations at Table 6.3 Annex VI of Circular No. 11/2021/TT-BXD. Current laws do not regulate provincial People’s Committees’ determination, declaration of unit labor costs for construction consultant experts in their localities.

With regard to construction investment consultancy, consultancy for formation of planning adjustments performed by domestic consultants and costs are determined by cost estimate, costs for these tasks shall be carried out according to Annex VI of Circular No. 11/2021/TT-BXD and Annex No. 2 of Circular No. 20/2019/TT-BXD.

In which wage of consultants for determination of construction investment consultancy expense estimates, costs for formation of planning adjustments shall be determined on the basis of unit labor costs for construction consultant experts regulated at the aforesaid Table 6.3 in accordance with requirements of expertise, experience of each consultant expert.

Ms Phuong Thao (VietlawOnline.com)
Please tag VietlawOnline.com when reposting this article

Related documents

Penalty document

Unknown

Information

Effective Date Unknown
ExpiredDate Unknown

Files attachment

enflag pdficon CV3788-25082022BXD[VLO].pdf

Timeline

No data

Construction

blue-check Regarding conditions for issuance of construction planning practicing certificate
blue-check Bases for determination of unit labor costs of construction consultant experts
blue-check Issue relating to payment for warranty of construction works
blue-check From August 8th, 2022: Fee for grade adjustment to certificate of construction capacity shall be increased to 1,000,000 VND
blue-check It is required to ensure the net building density for construction of factories not exceeding 70%
blue-check
blue-check Issue relating to completion of construction works
blue-check Regarding application of foreign standards to construction works in Vietnam
blue-check How to calculate costs for making feasibility study report and construction design costs
blue-check Regarding regulations on calculation of costs of appraisal of construction projects
blue-check Some notes upon liquidation of a construction contract due to the contractor’s breach in the contract
blue-check Regarding modification of categories, origin in a construction contract
blue-check Order of priority application of documents enclosed with a construction contract
blue-check Investor has the right to unilaterally terminate the contract if the contractor delays construction work for 56 consecutive days
blue-check A Joint Stock Company with less than 50% state capital shall not comply with the Law on public investment
blue-check Regarding construction permit for construction of works in industrial clusters
blue-check Procedures for judicial expertise in construction applicable from February 5th, 2022
blue-check Requirements upon making fire prevention and fighting designing for works according to foreign standards
blue-check Criteria for structures permitted for construction in HCMC amid Covid-9
blue-check Construction norms applicable from October 15th, 2021